Antminer S19 Pro (110Th) from Bitmain mining SHA-256 algorithm with a maximum hashrate of 110Th/s for a power consumption of 3250W.
The next-generation Antminer S19 Pro achieves 110 ± 3% TH/s leading the industry through performance. The power consumption of Antminer S19 Pro is 3250 ± 5% W and the power efficiency is 29.5 ± 5% J/ TH, further improving its predecessor s efficiency.
Antminer S19 pro has a new generation chip with modern architecture, and the power efficiency is as low as 23 J/TH. It is achieved by enhancing the circuit architecture. Use new power supply APW12 with high conversion efficiency.
Bitmain Antminer S19 Pro ASIC has installed a new firmware version. It can start more dynamically and work more stable. The new firmware introduces a faster startup speed and intelligent control mechanism to ensure the best mining experience.
The Bitman Antminer S19 PRO 110T Bitcoin Miner is a powerful and efficient blockchain mining solution. Featuring a 110 TH/s hashrate, this miner is capable of delivering fast and reliable mining performance. The miner is equipped with a state-of-the-art AI-based monitoring system that helps optimize performance and efficiency. It also comes with a built-in power supply unit, making installation and setup a breeze. With its advanced cooling system, the ANTMINER s19 pro ensures that your mining operation runs at optimal temperatures. This powerful miner is the perfect choice for those looking for a reliable and efficient mining solution
Model | S19 Pro |
Crypto Algorithm | SHA256 | BTC/BCH/BSV |
Hashrate | 110T ±3% |
Power Consumption | 2950W ± 5% |
Power Efficiency | 30J/T ± 5%@25° C |
Net Dimensions | 400mm*195.5mm*290mm |
Net Weight | 14.6KG |
Gross Dimensions | 570mm*316mm*430mm |
Gross Weight | 17KG |
Power supply AC Input voltag | 200~240Volt |
Power supply AC Input Frequency Range | 47~63Hz |
Power supply AC Input current | 20Amp |
Networking connection mode | RJ45 Ethernet 10/100M |
Operation temperature | 0~40°C |
Storage temperature | -20~70°C |
Operation humidity(non-condensing) | 10~90% RH |
Operation altitude | ≤2000m |
Q1: How long can I get the ordered products?
After you pay the sample charge and send us confirmed files, the goods will be ready for delivery in 4-8 working days. If the products are in stock,we will delivery it within 48 hours!
Q2: What is the location of your company?
Our Factory is located at Longgang District, Shenzhen, Guangdong, China
Q3: What‘s the price of needed products ?
Because of the changing of the market, the price changed per day, please feel free to ask our sales.
Q4:How about the Warranty?
365 days warranty for new machine
We keep improving and perfecting our merchandise and repair. At the same time, we get the job done actively to do research and progress for Factory directly Apexto 150kw 600kw Fluid Cooling Cabinet Liquid Cooling Heat Dissipation Immersion Cooling Systems for Ant Miner S19PRO, As a key enterprise of this industry, our corporation makes endeavours to become a leading supplier, dependant on the faith of expert quality & all over the world provider. Factory directly China Brand New Immersion Cooling Box 40kw and Immersion Cooling Box for 6sets S19 S19 PRO price, We have a strict and complete quality control system, which ensures that each product can meet quality requirements of customers. Besides, all of our products have been strictly inspected before shipment.